Current front view of the two-storey Caticlan Airport commercial building

Land + commercial building · Price on application

Caticlan Airport
commercial property

A two-level commercial asset at the Caticlan Airport Departure Area, Barangay Caticlan, Malay, Aklan—offered as a land-and-building opportunity with an adaptable frontage and established commercial setting.

Current cleaned presentation image.

185 sq.m.Land areaTax and site-plan reference
177 sq.m.Declared building areaTwo-storey assessment record
2 levelsCommercial buildingFlexible rooms and frontage
AirportDeparture-area settingBarangay Caticlan, Malay, Aklan

The opportunity

A recognizable structure with flexible commercial potential

The property combines a 185-sq.m. land reference with a two-storey building assessed at 177 sq.m. Its frontage has evolved to support separate upper access, covered circulation and multiple commercial spaces. Potential uses remain subject to title, zoning, lease, building and permit verification.

01

Departure-area setting

Visible commercial frontage at the Caticlan Airport Departure Area, with direct relationship to the existing road shown on the property sketch.

02

Adaptable floor plan

The current frontage presents multiple ground-level commercial bays and several upper-level doors or openings that may support flexible office or rental configurations.

03

Independent upper access

A later exterior stair and covered veranda create a strong separate approach to the upper level, subject to structural and compliance review.

Reference property sketch showing a 185 square metre parcel beside an existing road in Caticlan

Location record

Caticlan Airport Departure Area, Barangay Caticlan, Malay, Aklan

The available sketch identifies a 185-sq.m. parcel adjoining an existing road. It is a historical property reference—not a current relocation survey or proof of boundary position.

Offering
Land and building
Pricing
On application
Viewing
By appointment
Transaction
Subject to due diligence
Verified latitude11.9249939° N
Verified longitude121.9519217° E
Degrees, minutes, seconds11°55′30.0″N, 121°57′06.9″E
Location sourceOwner-confirmed property coordinates
What the live location views show
  • The owner-confirmed property point sits beside the labeled Boracay Airport Departure and Caticlan Airport terminal area.
  • The terminal complex, apron and runway appear within the same close Google Earth view.
  • The May 2019 Street View panorama shows the building frontage directly along the paved airport-access road.

The links use the owner-confirmed coordinates 11.9249939, 121.9519217. Google Earth currently displays aerial imagery dated 5 February 2025; the linked building-facing Street View panorama is dated May 2019. Imagery, dates and availability may change, and map imagery is not a relocation survey or proof of boundary position.

Airport investment context

Airport-gateway optionality at a major capacity inflection

The airport upgrade strengthens the long-term commercial story of Caticlan, but it also changes the immediate location equation. The defensible investment case is the building’s adaptable airport-area utility across several circulation outcomes—not a promise that every future passenger will pass its frontage.

≈4.0M2024 passengersOfficial DOTr figure reported by PCO
7.0MAnnual design capacityCapacity—not a traffic forecast
₱2.5BTerminal projectOfficial project cost reported by PCO
36,470 sq.m.New terminal complexMain terminal plus support building

Why the upgrade matters

A larger gateway can deepen demand around the airport economy

Official sources describe a new two-storey terminal implemented by San Miguel Corporation through Trans Aire Development Holdings Corporation and constructed by Megawide Construction Corporation. The project is designed to improve passenger processing, security, baggage handling and overall airport capacity.

The move from roughly 4.0 million passengers handled in 2024 to a terminal designed for 7.0 million represents 75% more design headroom. It does not mean passenger traffic is guaranteed to rise by 75%; it indicates that infrastructure is being built to accommodate materially greater throughput and a better passenger experience.

For a compact 185-sq.m. airport-area property, the competitive edge is not large-scale redevelopment. It is the potential to provide small, accessible and divisible spaces serving airport operators, travelers, transport providers, contractors, staff and nearby businesses.

Three-location test

A buyer should underwrite the property across all plausible terminal-transition outcomes

Scenario 01

Passenger circulation stays nearby

Highest upside for convenience retail, café, luggage, travel, transfer, payment and visitor services, supported by the building’s visible frontage and upper-level offices.

Scenario 02

The present terminal area is repurposed

Potential demand shifts toward airline, airport, contractor, staff, administrative, training, dispatch and professional uses rather than purely walk-in retail.

Scenario 03

Main passenger flow moves away

The property should then be valued as a destination-based office/service asset with airport proximity—not priced on unverified future pedestrian traffic.

Potential value drivers

  • Established airport-area address beside the current departure setting
  • Large existing passenger base and higher future terminal capacity
  • Separate upper access and several apparent rooms for multi-tenant flexibility
  • Possible near-term demand from construction and transition teams
  • Long-term tourism, transport and service-economy relevance

Checks that protect value

  • Confirm the future terminal entrance, access road and passenger-flow relationship
  • Review any planned road, right-of-way or frontage changes
  • Verify airport-area access, signage and permitted commercial uses
  • Inspect parking/loading, utilities, drainage and building condition
  • Reconcile title, tax, survey, lease and permit records

Programme note: PCO reported a December 2026 target, while CAAP and the DOTr briefing referred to completion in 2027. The website therefore treats late 2026–2027 as the official target window, subject to construction delivery and later official updates.

Potential uses

A flexible small-format asset for airport-area commerce and operations

These are positioning concepts, not representations of current approvals. Final use depends on zoning, title restrictions, existing leases, airport and road access, parking/loading, utilities, fire safety, accessibility and building permits.

Strongest mixed-use fit

Ground-floor services + upper offices

Retain accessible street-level commercial bays while using the separately approached upper level for offices, meeting rooms or small suites. This diversifies income and reduces reliance on a single tenant or passenger flow pattern.

Strong fit

Airport, travel and transfer operations

Tour coordination, passenger-transfer dispatch, airline or ground-handler administration, transport booking, travel support and related back-office functions could value the airport setting without requiring an in-terminal concession.

Strong fit

Staff, contractor and project offices

Site administration, training, recruitment, crew or staff support and contractor coordination may suit the multiple-room character—during construction and, more sustainably, during airport operations.

Frontage-dependent

Passenger convenience services

A café, convenience shop, pharmacy, mobile/data service, payment or exchange service, luggage storage, parcel counter or pre-booked visitor assistance could work if future pedestrian and vehicle circulation remains nearby.

Access-dependent

Light logistics and dispatch

Parcel handling, document delivery, baggage coordination or small tourism-supply dispatch may be viable if secure loading, parking, hours of access and airport-area rules can be documented.

Conversion-dependent

Lounge, clinic or short-stay support

A private waiting lounge, travel clinic, professional services or limited staff/crew rest use could be explored, but fire safety, accessibility, sanitation, accommodation rules and permitted use would need careful review.

Research checked 23 July 2026. Project timing, scope, traffic and access arrangements may change; buyers should obtain the latest approved plans and written confirmations directly from TADHC/SMC, DOTr, CAAP and the relevant local government units.

Buyer information

A concise path to a confident property review

The public presentation provides the main commercial story. Qualified buyers can move efficiently from initial review to inspection and controlled document due diligence.

Available

Property overview

Current presentation photographs, the location record, live mapping links and preliminary area references support an informed first review.

By appointment

Property inspection

A site visit can confirm room configuration, frontage, access, utilities and the building's present physical condition.

For qualified buyers

Transaction documents

Title, tax, ownership, occupancy, lease and permit documents can be organized for a controlled due-diligence review with the appropriate Philippine advisers.

Broker-neutral sale opportunity

Request pricing, a viewing or due-diligence materials through your referring broker

Qualified buyers should contact the broker or representative who shared this presentation. Pricing, viewing arrangements and controlled transaction documents can be provided through that same representative.

OfferingLand + two-storey commercial buildingLocationCaticlan Airport Departure Area, Barangay Caticlan, Malay, AklanPriceOn applicationViewingBy appointmentEnquiriesThrough the broker or representative who provided this linkBuyer packAvailable to qualified buyers

This presentation intentionally carries no named sales contact so it may be shared by authorized brokers and representatives.